Guidance installation instructions
Guidance installation instructions
2 induced on the wire gray for the positive, blue for the negative, before the installation of a pen to test the positive and negative after the connection.
3 inductive installation should be installed in parallel
4 installation of the guidance of the wire used in the best use of 4 square national standard line, the line with the line protection, induction installed in the tunnel cable trench test surface along the stone walls, or installed on the road ramp, installed on the ramp With the machine tangent slot, and then the line on the trough, with asphalt glue or epoxy resin potting.
5 installation of all the interface should be used to guide the use of waterproof adhesive tape to prevent leakage or short circuit and other dangerous phenomenon occurs.
6 before the induction mark must be measured before the control box output voltage shall not be higher than 26V, in a control box controlled by the end of the induction of which the end of the induced voltage shall not be less than 10V.
7 in the installation of the control box should first test the control box is normal power supply, control box connection method to follow the instructions in the control box to connect. Do not change, so as not to short circuit. Control box fuse 200V2A.
8 control box to be placed in the middle of the induced target (such as a control box control 80, which control box to be placed in the first 40 places, the outlet to both sides of the line), induced standard installation distance is generally 5-15 meters, Generally control about 70, preferably not more than 1000 meters
Shenzhen LuMing Traffic Equipment Co., Ltd.
TEL: 0086 755 27708545
MOB: 0086 13925263646
FAX: 0086 755 27701581
EMAIL: szlm@szlmjt.com
ADD: 3F, Building 1, Futing Industrial Zone, Guanlan Street, Longhua New District, Shenzhen
POST CODE: 518110
WEBSITES:
https://szlm9.1688.com/(China)
https://szlmjt.en.alibaba.com(English)
评论
发表评论